Searching on the internet to apply for palli bidyut online application tracking? So if you want I will tell you all the process about how you can apply online for Palli Bidyut’s new meter from our website. At present, there has been a great improvement in the power sector in Bangladesh. Bangladesh has seen a lot of electricity shortages in the past years. But currently, the government is delivering electricity to the homes of the people of Bangladesh.
That’s why many apply for rural electricity new meters. If you can apply for a new meter online properly. Then surely you will get a new connection within a few days. Again many times it is seen that due to defects in the old meter one has to apply online for a new meter.
Read more: Chittagong Load Shedding Schedule
Procedure to Apply Online for Rural Electricity Meter:
Of course, you must first apply for a new meter online by visiting the website of Palli bidyut, the Rural Electricity Regional Office of the region where you live. If you have a smartphone or computer at home. Then you can easily apply for a new meter online. Apply online by visiting the website of the Regional Rural Electrification Office in the area where you live. Fill in the information correctly in the mentioned form and submit it.
- First of all, you need to collect the Regional Rural Electrification Office website.
- After entering the website you should see the New Meter button to click on.
- Then you need to fill out the portal or form as per the above image.
- There you have to fill in the NID number, your mobile number, the name of the meter holder, and other required information.
- Remember that the information you fill in the form must be accurate.
Palli Bidyut Online Application Tracking Necessary Documents:
The following documents should be submitted along with the application form for the new connection
- Attested passport-size photograph (two copies) of the applicant
- Attested copy of land title deed
- Load demand papers
- Rent Deed of Land/Building (if applicable)
- Owner’s consent document in case of rent
- Details of previous connection if any and copy of the last bill paid
- Details of subscriber class in case of a temporary connection (if applicable)
- Trade License (if applicable)
- Indicative design of junctions
- Approval of appropriate authorities for setting up industrial establishments.
- Setting up of power factor improvement plants (Industrial and large commercial)
- Flat owner’s agreement with builder and owner of multi-storied residential/commercial building
- Attested copy
- Specifications and test results of all equipment installed in the substation and substation-related clearance issued by the Electrical Advisor and Chief Electrical Inspector.
- Clearance from the Department of Environment (if applicable)
Applicable to Residential Connection:
- Photocopy of national identity card and scan copy of rejection must be attached at the time of application
- The distance from the connection point to the service pole must be within 130 feet
- The distance of connection to the pole should be properly measured and given the correct information
- A connection is applicable if the total load is more than 50 kW
- After applying online, the required fees like application fee, membership fee, and security deposit along with information will be notified to your mobile number through SMS.
- The fields marked in red in the application form must be properly filled
- In the application form, the customer has to provide his own mobile number to receive the SMS
- Trucking ID and PIN number received after application must be saved
- Connection or paid fees can be paid through Dutch Bangla Bank Mobile Banking (Rocket).
Rural Electricity New Meter Connection Online Payment:
After applying online by following the above steps you must pay the meter fee through Rocket. For your convenience, we have attached below a diagram of how you can pay for free new meters through Rocket.
Finally, if you have followed our above processes. Then surely you will get a new meter connection in a very quick time. Also if you don’t get help from them after applying online. Then you can complain to the General Officer at Regional Rural Electricity Office.